Bituminous Pavement Reconstruction PTH 10 - Swan River

MI 6922 - 4.8 km of Provincial Trunk Highway 10 is undergoing a facelift in the Town of Swan River.  Construction of bituminous pavement, granular base course shoulders, intersection improvements and reconstruction of existing divided highway.  This includeswaste excavation, granular fill, granular base course, concrete medians and culvert replacement.  The 7.8 km stretch of PR 366, from the junction of PTH 10 to PR 485 gets a fresh bituminous overlay and granular base course shoulders, as well. 

P.O. Box 578, Dauphin, MB  R7N 2V4 Canada
© Strilkiwski Contracting Ltd. | Webdesign by Bankert Marketing Inc.