PTH 6 Roadside Safety Improvements - Wabowden/Sasagiu Rapids

MI 7020:  Improvements made to a 28 km section of Provincial Trunk Highway 6, from the Wabowden access to Sasagiu Rapids.   Areas here required increased width and ditch grade differential.  A general discription of the work includes composite material excavation, as well as solid rock excavation,  and drainage improvements.   

 

P.O. Box 578, Dauphin, MB  R7N 2V4 Canada
© Strilkiwski Contracting Ltd. | Webdesign by Bankert Marketing Inc.