Current Projects

Bituminous Pavement Reconstruction PTH 10 - Swan River

MI 6922 - 4.8 km of Provincial Trunk Highway 10 is undergoing a facelift in the Town of Swan River.  Construction of bituminous pavement, granular base course shoulders, intersection improvements and reconstruction of existing divided highway.  This includeswaste excavation, granular fill, granular base course, concrete medians and culvert replacement.  The 7.8 km stretch of PR 366, from the junction of PTH 10 to PR 485 gets a fresh bituminous overlay and granular base course shoulders, as well. 

Lake St.Martin Outlet Channel Access Road

MI 7006 : Construction of a composite excavation, shot rock and crushed rock embankment with a traffic gravel surface and through grade culvert installations on the Lake St.Martin outlet channel access road.  The location of the work is 72.3 km east of Provincial Trunk Highway 6 to 91.8 km north earsterly of PTH 6 for a total construction distance of 19.5 km in Electoral District of Interlake.

Northcott Drain Rehabilitation - The Pas/RM of Kelsey

 X34090 : Drainage improvements of approximately 1.6 km of Northcott Drain in the vicinity of The Pas in the Rural Municipality of Kelsey.  The work includes rehabilitation and installation of thru-dike culverts.

Cross Lake Airport

X23173 : This project involves regrading of ditches on both sides of runway, followed by repair and installation of French Drain at north end of Runway 5, and finally installation of a culvert across access road to airport stockpile.

Culvert Replacements PR 395

X051003 : A 1 km section of Provincial Road 395 ungergoes an emergency culvert replacement. This section is from PR 392 to 4 Km west of PR 392 in "Unorganized Territory", just south of the Town of Snow Lake. 