Culvert Installation PTH 20 Winnipegosis

X04501 : Removal of a treated timber box culvert and installaton of pre-cast concrete culverts including frost taper construction and bituminous patching on Provincial Trunk Highway 20, apprx 15.7 km North of PR 364, in the Rural Municipality of Mossey River (Bridge No. 3054)

P.O. Box 578, Dauphin, MB  R7N 2V4 Canada
© Strilkiwski Contracting Ltd. | Webdesign by Bankert Marketing Inc.